Port Stanley River
Dredging and Flood Control

Port Stanley River
Dredging and Flood Control

Location

Port Stanley, Ontario

Project Value

$2,869,000

Completion Date

2023

Owner

Municipality of Central Elgin

Location

Port Stanley, Ontario

Project Value

$2,869,000

Completion Date

2023

Owner

Municipality of Central Elgin

Project Details

The project consisted of the excavation of 93,630m3 of silty sand within Port Stanley Harbour to reduce instances of flooding along Kettle Creek. Open-water disposal sites were located 3km and 6km from the harbour entrance. All dredging was conducted utilizing Dean’s GPS-positioned hydraulic excavator. Open-water disposal was performed with Dean tugs and 600m3 dump-scows.

Turbidity monitoring was conducted at the dredge site and in Lake Erie, as the dump-sites were upstream from the municipality’s water intake. No shut downs due to turbidity exceedances were triggered. As a result of Dean’s aggressive pricing and Dean’s early completion of the original contract quantity, the Owner elected to increase the dredge quantity from the original 88,000m3.

Port Stanley Harbour Being Dredged By Dean Construction

Owner Information

Owner

Municipality of Central Elgin

Contact Person

Aaron Dooling

Phone

519-631-4860

Consultant Information

Consultant

Riggs Associated Ltd.

Contact Person

Jill Coles

Phone

519-657-1040