Niagara-on-the-Lake Wastewater
Treatment Plant Outfall Extension
Niagara-On-The-Lake Wasterwater
Treatment Plant Outfall Extension
Location
Niagara-on-the-Lake, Ontario
Project Value
$1,543,870
Completion Date
2014
Owner
Regional Municipality of Niagara
Location
Niagara-on-the-Lake, Ontario
Project Value
$1,543,870
Completion Date
2014
Owner
Regional Municipality of Niagara
Project Details
The offshore end of the existing outfall was exposed. It was discovered that the previous contractor had sealed the outfall by filling their excavated trench with concrete, which was not shown on their as-builts. The existing outfall was cut and chipped using cable saws and divers to permit the installation of the extension.
The extension consisted of 96m of 710mm HDPE with 15 risers/diffusers and 3 diver-access ports installed inside a steel pipe liner. Trench excavation and outfall installation was performed from spud barges. The extension was sealed, floated and towed into position, where it was sunk. Once in place and attached to the existing outfall the entire extension was filled with grout.
Piping for Outfall Extension
Owner Information
Owner
Regional Municipality of Niagara
Contact Person
Kathleen Hum
Phone
905-980-6000
Consultant Information
Consultant
Cole Engineering
Contact Person
Atakan Sevelin
Phone
905-685-4225